logoA titlebar A titlebar B titlebar C titlebar D
logoB titlebar A1 titlebar B1 titlebar C1 titlebar D1


FRIDGE IS IN
And quickly the whole thing was converted to a workbench.


PROGRESS
Soak in the changes


VIEW TOWARDS STAIR



DOORS
And door handles.


DIVIDER FRAME



DOOR FRAME
Nototice the masonite above covering the wall penetration.


BATH INTERIOR
Cardboard template for wall penetration. Plus the door frame is continuing along. I used the cheaper pine instead of the easier to work with poplar.


DOOR TO SHOP



PAINTING DOORS



NO MORE HOLE IN CEILING
Not too shabby. You can see the metal plate if you look closely enough on the right.


LET'S PAINT THE BAR A LIGHT GRAY
Oops. You can see the peg board in the divider screen.


A NEW HOLE
To the left of the electrical outlet. It would be nice to have a clean cable outlet.


WIRE CHASE
Blends into the background quite well.


HALF WALL TOP
Was originally slated for tile as well. Changed over to painted masonite.


THAT'S BETTER



PAINTED BATHROOM FLOOR
Really coming together now.


VIEW TOWARDS STAIR
Notice the damp floor - the final moping before carpet goes down.


CARPET GOES DOWN!
Finally.


MODULAR CARPET
The field went down in an hour or so. The cutting in of the trim pieces took four to six hours.


DOESN'T THAT LOOK NICE



BAR AREA CARPET
The gray was used to the tops - the lower area covered in masonite, the bar proper in 1x wood.




copyright ©2005-06 generictrend.com         contact: thE heaD sheeP      webmasteR
photos