![]() |
![]() |
![]() |
![]() |
![]() |
| THOUGHTS | | | JUNK DRAWER | | | MADE STUFF | | | BORING STUFF | | |
| FRIDGE IS IN And quickly the whole thing was converted to a workbench. |
||||||||
| PROGRESS Soak in the changes |
||||||||
| VIEW TOWARDS STAIR |
||||||||
| DOORS And door handles. |
||||||||
| DIVIDER FRAME |
||||||||
| DOOR FRAME Nototice the masonite above covering the wall penetration. |
||||||||
| BATH INTERIOR Cardboard template for wall penetration. Plus the door frame is continuing along. I used the cheaper pine instead of the easier to work with poplar. |
||||||||
| DOOR TO SHOP |
||||||||
| PAINTING DOORS |
||||||||
| NO MORE HOLE IN CEILING Not too shabby. You can see the metal plate if you look closely enough on the right. |
||||||||
| LET'S PAINT THE BAR A LIGHT GRAY Oops. You can see the peg board in the divider screen. |
||||||||
| A NEW HOLE To the left of the electrical outlet. It would be nice to have a clean cable outlet. |
||||||||
| WIRE CHASE Blends into the background quite well. |
||||||||
| HALF WALL TOP Was originally slated for tile as well. Changed over to painted masonite. |
||||||||
| THAT'S BETTER |
||||||||
| PAINTED BATHROOM FLOOR Really coming together now. |
||||||||
| VIEW TOWARDS STAIR Notice the damp floor - the final moping before carpet goes down. |
||||||||
| CARPET GOES DOWN! Finally. |
||||||||
| MODULAR CARPET The field went down in an hour or so. The cutting in of the trim pieces took four to six hours. |
||||||||
| DOESN'T THAT LOOK NICE |
||||||||
| BAR AREA CARPET The gray was used to the tops - the lower area covered in masonite, the bar proper in 1x wood. |
||||||||
| copyright ©2005-06 generictrend.com contact: thE heaD sheeP webmasteR |